Skip to Content
chevron-left chevron-right chevron-up chevron-right chevron-left arrow-back star phone quote checkbox-checked search wrench info shield play connection mobile coin-dollar spoon-knife ticket pushpin location gift fire feed bubbles home heart calendar price-tag credit-card clock envelop facebook instagram twitter youtube pinterest yelp google reddit linkedin envelope bbb pinterest homeadvisor angies
power generator

Power Generation Plant Maintenance & Planned Outage Work

Hayes Mechanical provides exceptional maintenance and planned outage mechanical services to several power generation plants across the country. Work consists of boiler repairs, piping upgrades and repairs, environmental upgrades, fuel conversions, conveyor system maintenance and repairs, industrial fan maintenance and repairs, plus other various site repair needs and maintenance.

  • Total Man-hours: 2,200,000 +
  • Safety: <1.0 RIR
  • Quality: <1% Rework
generating system being built

Joliet, Illinois Generating Station #29 Coal to Natural Gas Fuel Conversion Project

Hayes Mechanical provided field installation expertise for this $42M project. Work included internal plant gas piping to and from gas dryers and ignition units, complete installation of new auxiliary boiler and related equipment.

  • Total Man Hours: 131,577
  • Safety: 0 RIR
  • Quality: <1% Rework

Equipment Installed

  • New Auxiliary Boiler
  • New Unit Ignitors
  • New Vacuum System Pumps
Millwright Industrial Booster Fan / Ventilation

Millwright Industrial Booster Fan / Ventilation

Hayes Mechanical provides field disassembly and reassembly services for large industrial fan-ventilation systems and other mission critical machinery. Our millwright teams are able to provide equipment rebuilding with required rigging and erection needs along with laser alignment and welding capabilities.

Pennsylvania Generating Station

Homer City, Pennsylvania Generating Station

Hayes Mechanical has provided ongoing maintenance and outage services for Homer City Generating Station for 5+ years. Current man-hours are well over 500,000 with a <1.0% RIR and <1% rework. Recent project highlights;

  • Total Man-hours: 150,000+
  • Safety: <1.0 RIR
  • Quality: <1% Rework

Equipment Services Provided

  • Boiler Water Wall Replacement
  • Boiler Water Riser Replacement
  • Reheat Thermal Tube Replacement
  • SCR (Selective Catalytic Reducer) ReplacementMaintenance and Outage Mechanical Services

Request an Estimate Today